Skip to main content
Hit enter to search or ESC to close
Close Search
Palmer’s Security SolutionsPalmer’s Security Solutions
Menu
  • About Us
    • Our Team
    • Careers
    • Privacy Policy
    • Sitemap
  • Solutions
    • Radio Frequency (RF) Rated Doors – TEMPEST Shielding
      • RF Door, Frame, & Hardware Finishes
    • Sound (STC) Rated Doors
    • Forced Entry and Ballistic Resistant (FEBR) Doors
    • Security Hardware
    • X-10 Combination Locks
    • The PSS FatIvan
      • PSS FatIvan – Order Form
  • Training
  • Our Work
    • Data Centers
    • Department of Defense: Pentagon
    • United States Army: Medical Facility
    • Peterson Building
    • COPT Building
  • News & Events
    • Newsletter Sign-Up
  • Quick Ship
  • linkedin google-plus
  • Contact Us
Palmer’s Security Solutions
  • About Us
    • Our Team
    • Careers
    • Privacy Policy
    • Sitemap
  • Solutions
    • Radio Frequency (RF) Rated Doors – TEMPEST Shielding
      • RF Door, Frame, & Hardware Finishes
    • Sound (STC) Rated Doors
    • Forced Entry and Ballistic Resistant (FEBR) Doors
    • Security Hardware
    • X-10 Combination Locks
    • The PSS FatIvan
      • PSS FatIvan – Order Form
  • Training
  • Our Work
    • Data Centers
    • Department of Defense: Pentagon
    • United States Army: Medical Facility
    • Peterson Building
    • COPT Building
  • News & Events
    • Newsletter Sign-Up
  • Quick Ship
  • Contact Us

COPT Building

Chantilly, VA

Completed in the fall of 2019, PSS supplied and installed over 400 openings. Over 100 sound-rated door systems were installed and passed sound testing without any adjustments required. PSS supplied the material as the project schedule required and was able to offer a quality assurance and quality control program to keep the client updated with our workmanship.

  • Previous Project
Share Tweet Share Pin
Home » Projects » COPT Building

© 2026 Palmer's Security Solutions. All Rights Reserved.